Space Checklist
From Dallas Makerspace
Here is a list of the things that need to happen to go from where we are now to rocking out in our new space.
Before Move in ToDo list
-
Identify a space -
create spreadsheet showing financial feasibility -
DPRG board signs off on it -
DMS signs off on it -
Transfer required funds from paypal money market to bank checking account -
Get general liability insurance for the space -
get check for first month's rent and deposit (another month's rent) -
fill out lease; get it signed -
turn in lease, check, and proof of insurance to building people -
get CO from City of Dallas -
pass City of Dallas inspection -
rock out in our new space
After Move in ToDo list
-
Electricity from a 100% renewable source -
Move DPRG furniture -
Move DPRG tools and equipment to warehouse -
Internet connectivity (ideally from a public AP friendly ISP)-
device. (mmetzger provided a CLEAR modem) -
power supply. (2A power supply provided by ahatchett) -
gateway server. (done) -
purchase account. I bought a month of inet access (20100818, PeterS) -
setup dyndns. (done-- http://dallasmakerspace.dyndns.org)
-
-
refrigerator (I've got a small one we can use initially) - Check air filter size and replace (probably need carbon filter)
- Clean (wall, ceiling, floors, windows)
- repair/replace outlet and switch plates
- Tape and bed walls in warehouse
- paint warehouse floor if desired
- paint warehouse walls if desired (mural was suggested)
- Security access system (electronic with key override)
- Move DPRG Noise Boundary equipment to warehouse
- shelves
- insurance for contents?
- liability waiver form for anyone who uses tools
- Darkroom
- finish out walls/ceiling
- paint
- lighting
- exterior in-use indicator
- Welding station
- need 50 amp 220v circuit added in warehouse
- 2A-20BC rated fire extinguishers for hot work area
- Dallas Fire-Rescue Dept Hot Work Permit (for welding)